Construction Companion
"What must I verify before each construction milestone so costly mistakes are caught before they become permanent?" One workflow across 16 stages — every check reuses this platform's already-sourced engines. Stages where the work becomes irreversible (borewell drilling, staircase casting, plumbing concealment, wall closure, slab pour) carry a pre-work gate that blocks completion until the required checks are recorded.
Change & Deviation Log
Record a planned vs. actual position — this re-runs the same governed check for both and shows the verdict change. Cost-of-correction estimates are not tracked (no cost data source exists on this platform).
Final Construction Readiness Report
Photo/document upload is not built — this version records a text reference/placeholder only (filename, description, or where the file is stored); cloud storage integration is explicitly pending. Progress, evidence and the deviation log are stored in this browser only (no accounts yet) — clearing browser data clears this workflow. Electrical panel/meter placement, the physical zone-marking procedure, and housewarming timing (muhurtham) have no governed Vastu rule on this platform and ship as construction-practice checklists or are marked out of scope, not a fabricated Vastu verdict. Cost-of-correction estimates for a deviation are not computed — no cost data source exists here.
More free tools
Run one check on its own: Borewell Checker, Staircase Checker, Gate Checker, Audit Report, Floor Plan Reviewer, Property Planning Studio.